Date:2022-03-22
On March 31, 2020, as the on-spot commander blew the whistle, a gigantic crane roared and lifted building materials up at the construction site of the Nanling 100MW power booster station of CECEP Wind Power (Wufeng) Co., Ltd. This marked that the company, located in Hubei Province, the hardest-hit region in China during the COVID-19 epidemic, resumed full operation.
Date:2022-03-22
On the morning of March 23, 2020, Song Xin, secretary of the Party Committee and chairman of China Energy Conservation and Environmental Protection Group (CECEP), visited CECEP subsidiaries Hi-Tech Optoelectronics Co., Ltd. and Xiaotangshan Recycled Water Plant, which takes
Date:2022-03-22
The No.4 Metallurgical Construction Company of China Limited, a subsidiary of CECEP, actively implements requirements of the government and the group company on epidemic prevention and control and the resumption of production and operation, continuously strengthens project management, and promote both epidemic control and production resumption in a holistic way.
Date:2022-03-22
The leading group of epidemic prevention and control of Beijing Municipal Government decided to officially open Xiaotangshan Hospital on March 16 to receive and treat suspected cases and mild and ordinary confirmed patients of COVID-19 returning from abroad to Beijing. It is estimated that the hospital wastewater may reach 700 tons each day.